SANDSFOOT CASTLE - IMO 8891065           
 

Meer foto's

 

 

 

Gegevens

 

(c) J.P.B.A. VAN HAARLEM - TUG DOCUMENTATION

Build: 1965.

Delivered: 16-07-1965.
Shipyard: J.S. Doig (Grimsby) Ltd., Grimsby.
Yardnumber: 84.

Main Particulairs: 28.68 x 26.32 x 7.73 x 3.79 x 2.893 meter,

Register tonnage: 149GRT

Engine: 2x 8 cyl. Lister-Blackstone, type ERS8MGR.
Construction year: 1965.
Build in hull: 1965.
Output: 1318 bhp. = 969 kW. Rotation: 750 rpm.
Main Propulsion: Twin Propellors each in a Kort-nozzle.

BP: 16.1 ton.
Speed: 10.5 knots.

History:

16-07-1965 A.129 DALMATIAN/U.K. Ministry of Defence (Port Auxiliary Service), London.

-1996 A.129 DALMATIAN/U.K. Ministry of Defence (Port Auxiliary Service), London.
Manager: Serco Denholm Ltd., Portsmouth.

01-12-2003 SANDSFOOT CASTLE (2)/Portland Port Authority, Portland.
Manager: Portland Towage Ltd., Portland.

01-11-2009 SANDSFOOT CASTLE/Griffin Towage & Marine (J.A. Eveleigh), Portland.

00-12-2014 SANDSFOOT CASTLE/Griffin TMS Ltd., Poole.

 

Disclaimer



Foto verantwoording



Naar start fotogalerij



• Klik op foto's indien aanwezig in kolommen voor vergroting




Meer nieuws
klik hier


 

 

 

 


 

 

 

Stichting B.A.S.M. / SLEEP & DUWVAART © 2022